M4 Aviation Group proudly presents this 2008 Lear 40XR to the market. Highlights of this phenomenal aircraft include:
AIRFRAME & ENGINE
- S/N: 45-2102 | Model: Learjet 40XR
- Hours: 3315
- Cycles: 2547
- Make: Bombardier
- Year of Manufacture: 2008
ENGINES
- Model TFE731-20BR
- #1 P-116921C 3315 Hours
- #2 P-116922C 3315 Hours
- MPI c/w 463 Hours ago at 2852 TTSN. 3137 Hours remaining
- CZI due 7000 TTSN. 3688 Hours remaining
- NO PROGRAM – SAVE MONEY BY SELF BUDGETING
Exterior
Immaculate original Matterhorn White with Blue, Gray & Red stripes
Interior
- Immaculate original Configuration/PAX: Executive/6 passengersvplus belted Lav seat (1)
- Tan leather forward four-place club grouping and two aft seats, belted lav seat Carpet
- Refreshment: Forward galley w/Hot Coffee pot and rest seat
- Cabinetry/Wood: High-gloss wood veneer package, Slimline tables
- Entertainment: Airshow 410, Cabin audio, video w/DVD, forward 10.4-inch monitor
- 110-volt power
- Lav w/wash basin & lighted vanity mirror
- Six under seat storage drawers, plus Lavatory baggage storage area w cargo net
Features
- Fresh A, B, C and Gear
- FMS upgrade – Dual UNS 1EW’s
(WAAS/LPV) Extended - Extended range service bulletin (SB 40-28-06)
Avionics
- Honeywell Primus 1000 IFCS Avionics Package: Honeywell Primus 1000
- ADSB-out
- WAAS / LPV
- ADF: Yes
- AHRS: Dual
- Communication Radios: Dual Honeywell RCZ-833 w/8.33 spacing CVR: Universal 120 minute
- DME: Dual
- EFIS: Honeywell 4-tube 8×7-inch
- Flight Director: Honeywell Primus 1000 IFCS FMS: Dual Universal UNS-1EW
- GPS: Dual Universal
- Hi Frequency: Honeywell HF-1050 w SELCAL
- Navigation Radios: Dual Honeywell RNZ-851 w/FM immunity Radar Altimeter: Honeywell RT-300
- RMI: Dual
- RMU: Dual Honeywell RM-855 SATPHONE: ICGICS-100 Iridium
- TAWS: Honeywell Mark V EGPWS
- TCAS: ACSS TCAS-2000 TCAS-II w/change 7.0
- Transponder: Dual Honeywell Mode S w/enhanced surveillance Weather Radar: Honeywell 660
Maintenance:
Phase A – December 2024
Phase B – December 2024
Phase C – December 2024
Phase D – December 2020
Gear – December 2024
Maintenance Due:
Phase A – December 2025
Phase B – December 2026
Phase C – December 2028
Phase D – December 2028
Gear – December 2032